Call
0113 436 0402
york minster logo

York Minster

Cathedral
York
winners logo 25 sustainable project of the year

The Organisation

Chapter is a registered charity (Charity Registration Number 1201499) that is governed by a board of executive and non-executive trustees. All aspects of the Minster’s statutory compliance, strategic vision, policy and priorities are overseen by Chapter.

Chapter is responsible for the implementation and delivery of every aspect of worship, mission, outreach and learning, as well as the responsible stewardship of the Minster’s properties and finances. It is advised by a number of specialist committees and external advisors.

The Challenge

To design, install and deliver the electrical installation, supplies and associated switch gear, accessories and Solar PV equipment to enable the Minster to benefit by generating their own energy.

To help the Minster align with sustainability targets and to achieve cost savings via renewable technologies.

The Solution

Volta Compliance designed the low voltage electrical installation including schematic drawings and cable calculation reports.

Solar Edge equipment was specified to include 2x inverters a fire fighters gateway for safety and a dedicated distribution board and inverter circuits.

The Results

York Minster was exceptionally pleased with the results and they are now generating their own energy powered by the sun.

This project was recognised nationally as Sustainable Project of the Year at the ECN Awards 2025.

Check out the video for a brief overview of the York Minster project

Related Case Studies

2Excel Aviation

Read Article
Right Chevron

North Brewing Co

Read Article
Right Chevron
View More
chevron-down